China High quality sheet space 24mm PVC cooling tower drift eliminator Quotes, Factory, Purchasing, Manufacturers
Home > Products > Others Drift Eliminator > sheet space 24mm PVC cooling tower drift eliminator

sheet space 24mm PVC cooling tower drift eliminator

Brand : Respect

Product origin : Wuxi Jiangsu Province

Delivery time : 10 days after payment

Supply capacity : 10000 pieces per day

Product Description

sheet space 24mm PVC cooling tower drift eliminator

Drift Eliminators, made out of rigid PVC, are designed to remove entrained particles from air steam efficiently, with minimum pressure drop, thereby reducing the fan power requirement when the air passes through the Drift Eliminator.

Water droplets are separated from the air drift at the three direction change points on the drift eliminator.

IMG_6294.JPG

Cooling Tower Drift Eliminator Specifications.

1. Width: 145mm, etc.

2. Length: 1000mm ,1200mm, etc.

3. Thickness: 0.38mm, etc.

4. Brand:Respect.

5. Color: Black, gray, etc.

6. Material: PVC.

7. Trade Term: EXW, FOB, CFR, CIF, etc.

8. Payment Term: T/T, Western Union, Money Gram, etc.

IMG_7375.JPG

Cooling Tower Drift Eliminator Characters.

1. Maximum operational safety.
2. Legal compliance.
3. Original therml performance of your cooling equipment.
4. Easy cleaning.
5. Dry surrouding by minimum drift emission.

6. Easy install.

7. Long life time.

8. Customized

Detailed Images

11.pngIMG_7308.png


IMG_6289.JPGIMG_7322(1).JPG


Related Product

IMG_7184.JPGIMG_6216.jpg

       Air Inlet Louver                                        KU 750/950  cooling tower infill  


IMG_5888.jpgIMG_7291.JPG

       LJ 750 cooling tower infill                              Air Inlet Louver  


IMG_7020.JPGIMG_7189.JPG

      SXB 610 cooling tower infill                      SP 1000 cooling tower infill  

IMG_7328.JPGIMG_19-(4).png

     Drift Eliminatior                                     MA 915/1220/1520 cooling tower infill


Our Company

photobank (2).jpg

仓库图片IMG_6101.JPG仓库图片IMG_6107.JPG


Packing and Delivery

IMG_5766.JPGIMG_5764.JPG


IMG_7176.JPG

FAQ

1. What is the MOQ of PVC cooling tower fill?

The MOQ is 100 pcs.

2.What is the lead time?

The lead time is around 10 days to 15 days, based on your quantity.

3. Can you offer the free samples,how can we get ?

Yes,we can offer free samples for you testing the quality, you may pay for the freight.

4. How can we choose the shipping way?

For the small order,we suggest to ship by DHL,FEDEX,UPS door to door service. It will take 3-5days.

For the larger order,we suggest to ship by sea.If urgent,you can als choose air shipping.

Contact way

Welcome To Contact With Me!

If you have any need foe cooling tower components, such as cooling tower fill, drift eliminator, mist eliminator, cooling tower spray nozzle and so on, please don't hesitate to contact with us. In here, each pnenny is count and you will get high quality products and good service. We trust, good quality and service are the basic of long term business.

Ms Yaling

Mail:respect-1@outlook.com

Wechat/Whatsapp:8618761578489

Skype:tang.yaling

Please feel free to give your inquiry in the form below. We will reply you in 24 hours.
* Subject :
* Email :
  • Name :

  • Phone:

  • *Message :
    Message